BBS Architects Engineers

Jasper County

Owner: Jasper County
Architectural and Engineering Design Services: BBS Architects | Engineers
General Contractor: Garling Construction
Construction Completed: 2022
Project Data: 16,000 SF (11,000 SF renovation 4,000 SF Addition)
 

Photo Credit: Tim Bungert

Client Need 
BBS assisted Jasper County with a building and programming study, determining that the building selected by the County should undergo full interior renovations, along with a small addition, to accommodate current space needs for a variety of county offices.
Approach 
BBS worked closely with multiple departments including the Department of Public Health, Department of Corrections Services, Department of Human Services, Veterans Affairs adn the Department of Motor Vehicles to program and design individual office suites within the 16,000 SF footprint.  The spaces were arranged to provide the most efficient use of space, while considering the security of staff and visitors, visual and acoustic privacy, and simplified way finding.
Solution 
BBS worked to meet the County’s sustainability goals, by designing infrastructure for the building’s solar array and geothermal system.  New LED light fixtures, continuous insulation and double pane windows will maximize energy efficiency throughout the lifespan of the building.
The building’s users are excited to move into the new building featuring amenities, such as break rooms and shared conference spaces, with fresh finishes and improved access to daylight. The users and the public are looking forward to the accesiblity and convinience to better serve Jasper County. 

Food Sciences Building - Room 2379 Renovation
Covered Walkway
Extension 4-H Youth Building
Levitt Center for University Advancement
Kemin Food Sciences Lab Renovation
Biological Sciences Facility
ABC - Office Build-Out
Iowa City Federal Building - VHA Renovations
Beardshear Hall Remodeling
Executive Suites Renovation
Corporate Headquarters Renovation
MacKay Hall Auditorium Renovation
Hub Tower Conference Center
Union Drive Community Center Renovations
Camp Dodge Chapel Addition and Renovation
Camp Dodge Pool Campus Improvements
BBS at 219 8th Street
219 Eighth Street
Corporate Headquarters
Dodge House Renovations
Terminal
Office Renovation
Home Office Building with Expansion
Hospital Emergency Room Renovation & Expansion
IADA Office Renovation
Common Ground - Coffee Shop
ETRC Howe Hall
Goodnow Hall Restoration & Renovation
Sabin Hall Renovation – LEED Gold
New Office
Reid “E” Research Facility
Chemistry Building Addition & Renovation
VRAC C6 and Office Suite
Corporate Highrise
ETRC Hoover Hall
© 2026 BBS Architects | engineers, All rights reserved.