BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Food Sciences Building - Room 2379 Renovation
BBS at 219 8th Street
Foth Companies Des Moines Office
Hospital Emergency Room Renovation & Expansion
Union Drive Community Center Renovations
Terminal
Beardshear Hall Remodeling
Dodge House Renovations
Biological Sciences Facility
Chemistry Building Addition & Renovation
Office Renovation
Executive Offices
Headquarters Building
Kemin Food Sciences Lab Renovation
Camp Dodge Pool Campus Improvements
VRAC C6 and Office Suite
ABC - Office Build-Out
Goodnow Hall Restoration & Renovation
ETRC Hoover Hall
Levitt Center for University Advancement
Extension 4-H Youth Building
Camp Dodge Chapel Addition and Renovation
Sabin Hall Renovation – LEED Gold
Covered Walkway
ETRC Howe Hall
IADA Office Renovation
Administration Building Renovation and Addition
Corporate Highrise
Reid “E” Research Facility
Iowa City Federal Building - VHA Renovations
MacKay Hall Auditorium Renovation
EMC 219 Eighth Street
Common Ground - Coffee Shop
Hub Tower Conference Center
New Office
© 2026 BBS Architects | engineers, All rights reserved.