BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Goodnow Hall Restoration & Renovation
Iowa City Federal Building - VHA Renovations
Reid “E” Research Facility
New Office
IADA Office Renovation
219 Eighth Street
Dodge House Renovations
Hub Tower Conference Center
Food Sciences Building - Room 2379 Renovation
Office Renovation
Chemistry Building Addition & Renovation
VRAC C6 and Office Suite
MacKay Hall Auditorium Renovation
Corporate Headquarters
Corporate Highrise
Camp Dodge Pool Campus Improvements
Hospital Emergency Room Renovation & Expansion
Biological Sciences Facility
Extension 4-H Youth Building
ETRC Hoover Hall
Corporate Headquarters Renovation
Kemin Food Sciences Lab Renovation
Beardshear Hall Remodeling
Home Office Building with Expansion
ETRC Howe Hall
Sabin Hall Renovation – LEED Gold
Terminal
ABC - Office Build-Out
Covered Walkway
Union Drive Community Center Renovations
Levitt Center for University Advancement
© 2022 BBS Architects | engineers, All rights reserved.