BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Corporate Headquarters Renovation
Terminal
Corporate Headquarters
Biological Sciences Facility
Iowa City Federal Building - VHA Renovations
Goodnow Hall Restoration & Renovation
Extension 4-H Youth Building
BBS at 219 8th Street
MacKay Hall Auditorium Renovation
Reid “E” Research Facility
Food Sciences Building - Room 2379 Renovation
Dodge House Renovations
Office Renovation
219 Eighth Street
VRAC C6 and Office Suite
Camp Dodge Pool Campus Improvements
Union Drive Community Center Renovations
Hub Tower Elevator Modernization
Home Office Building with Expansion
Covered Walkway
Hub Tower Conference Center
ABC - Office Build-Out
Hospital Emergency Room Renovation & Expansion
New Office
Sabin Hall Renovation – LEED Gold
Chemistry Building Addition & Renovation
IADA Office Renovation
Beardshear Hall Remodeling
ETRC Hoover Hall
Kemin Food Sciences Lab Renovation
Levitt Center for University Advancement
ETRC Howe Hall
Camp Dodge Chapel Addition and Renovation
Corporate Highrise
Common Ground - Coffee Shop
© 2024 BBS Architects | engineers, All rights reserved.