BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

ABC - Office Build-Out
Corporate Headquarters Renovation
Terminal
BBS at 219 8th Street
Corporate Highrise
ETRC Howe Hall
VRAC C6 and Office Suite
ETRC Hoover Hall
Union Drive Community Center Renovations
219 Eighth Street
Food Sciences Building - Room 2379 Renovation
IADA Office Renovation
Goodnow Hall Restoration & Renovation
Home Office Building with Expansion
Dodge House Renovations
Corporate Headquarters
Reid “E” Research Facility
Hub Tower Elevator Modernization
Office Renovation
Chemistry Building Addition & Renovation
Kemin Food Sciences Lab Renovation
Hub Tower Conference Center
Levitt Center for University Advancement
Camp Dodge Pool Campus Improvements
Extension 4-H Youth Building
New Office
Common Ground - Coffee Shop
Beardshear Hall Remodeling
Covered Walkway
Iowa City Federal Building - VHA Renovations
MacKay Hall Auditorium Renovation
Camp Dodge Chapel Addition and Renovation
Biological Sciences Facility
Sabin Hall Renovation – LEED Gold
Hospital Emergency Room Renovation & Expansion
© 2024 BBS Architects | engineers, All rights reserved.