BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Iowa City Federal Building - VHA Renovations
Levitt Center for University Advancement
ETRC Howe Hall
MacKay Hall Auditorium Renovation
IADA Office Renovation
Hub Tower Conference Center
Extension 4-H Youth Building
New Office
Goodnow Hall Restoration & Renovation
Corporate Headquarters
VRAC C6 and Office Suite
Sabin Hall Renovation – LEED Gold
Home Office Building with Expansion
Terminal
Food Sciences Building - Room 2379 Renovation
Kemin Food Sciences Lab Renovation
Corporate Highrise
Beardshear Hall Remodeling
Camp Dodge Pool Campus Improvements
ETRC Hoover Hall
Corporate Headquarters Renovation
Corporate Headquarters
Office Renovation
219 Eighth Street
Reid “E” Research Facility
Biological Sciences Facility
Hospital Emergency Room Renovation & Expansion
Dodge House Renovations
Covered Walkway
Chemistry Building Addition & Renovation
© 2020 BBS Architects | engineers, All rights reserved.