BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

ABC - Office Build-Out
Hub Tower Elevator Modernization
Office Renovation
VRAC C6 and Office Suite
Kemin Food Sciences Lab Renovation
Food Sciences Building - Room 2379 Renovation
IADA Office Renovation
Hospital Emergency Room Renovation & Expansion
Dodge House Renovations
Covered Walkway
Home Office Building with Expansion
Corporate Headquarters
Beardshear Hall Remodeling
Biological Sciences Facility
Goodnow Hall Restoration & Renovation
Terminal
ETRC Hoover Hall
Iowa City Federal Building - VHA Renovations
Corporate Headquarters Renovation
Levitt Center for University Advancement
219 Eighth Street
Corporate Highrise
ETRC Howe Hall
MacKay Hall Auditorium Renovation
Reid “E” Research Facility
Chemistry Building Addition & Renovation
Hub Tower Conference Center
Camp Dodge Pool Campus Improvements
Sabin Hall Renovation – LEED Gold
Union Drive Community Center Renovations
New Office
Extension 4-H Youth Building
© 2022 BBS Architects | engineers, All rights reserved.