BBS Architects Engineers

US Department of Veterans Affairs

VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation
VA – Executive Suites Renovation

Environmental Engineering: Partnering with Apex Companies LLC
Project Cost: $1,500,000
Construction Completed: 2015

Phase IV of the renovation of the 1932-era building 3 involved extensive interior renovation for the VAMC director’s suite. As some of the building’s functions are deemed “mission critical,” appropriate physical security measures were applied in accordance with the Physical Security Design Manual for VA Facilities. BBS performed architectural and electrical engineering design services. All documentation was produced utilizing BIM technology. The design services also included compliance with the Secretary of the Interior’s Standards for Rehabilitation and coordination with the State Historic Preservation Office.

Dodge House Renovations
VRAC C6 and Office Suite
Office Renovation
Biological Sciences Facility
Sabin Hall Renovation – LEED Gold
Hub Tower Conference Center
BBS at 219 8th Street
Home Office Building with Expansion
New Office
Kemin Food Sciences Lab Renovation
MacKay Hall Auditorium Renovation
Covered Walkway
Reid “E” Research Facility
Corporate Highrise
Terminal
Hospital Emergency Room Renovation & Expansion
Camp Dodge Chapel Addition and Renovation
Food Sciences Building - Room 2379 Renovation
Union Drive Community Center Renovations
Corporate Headquarters Renovation
Levitt Center for University Advancement
Chemistry Building Addition & Renovation
Corporate Headquarters
219 Eighth Street
Common Ground - Coffee Shop
ETRC Howe Hall
Goodnow Hall Restoration & Renovation
ETRC Hoover Hall
IADA Office Renovation
Beardshear Hall Remodeling
Iowa City Federal Building - VHA Renovations
Extension 4-H Youth Building
Camp Dodge Pool Campus Improvements
ABC - Office Build-Out
Hub Tower Elevator Modernization
© 2024 BBS Architects | engineers, All rights reserved.