BBS Architects Engineers

The University of Iowa

Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility
Biological Sciences Facility

Project Data: 60,200 GSF
Construction Cost: $11,700,000
Construction Completed: 2000

Client Need:
The goal for Biology Building East was to be part of a multi-phase construction project to provide state-of-the-art teaching and research facilities for the Department of Biological Sciences. In addition to the new building, four existing Biology buildings will be renovated and provided with new mechanical, electrical and life safety systems

BBS Approach:
BBS provided design services to meet the client’s stated goal.

Project Results:

  • Construction of the new building allows the Department to vacate large sections of the existing facilities, enabling renovations and remodeling with minimal disruptions to ongoing teaching and research.
  • The building provides the Department with flexible teaching and research space, accommodating changing technologies and directions.
  • Teaching facilities are clustered on the first floor and include teaching labs, an auditorium, and seminar room.
  • Upper floors of the building contain research functions including a rooftop greenhouse.
  • Located across Dubuque Street from the existing buildings, a skywalk was designed to connect the new building to the existing Biology Complex.
Terminal
Covered Walkway
Sabin Hall Renovation – LEED Gold
Beardshear Hall Remodeling
New Office
Executive Suites Renovation
Extension 4-H Youth Building
219 Eighth Street
Chemistry Building Addition & Renovation
Office Renovation
Dodge House Renovations
ETRC Hoover Hall
Kemin Food Sciences Lab Renovation
Hospital Emergency Room Renovation & Expansion
Camp Dodge Pool Campus Improvements
ETRC Howe Hall
VRAC C6 and Office Suite
Food Sciences Building - Room 2379 Renovation
IADA Office Renovation
MacKay Hall Auditorium Renovation
Home Office Building with Expansion
Iowa City Federal Building - VHA Renovations
Union Drive Community Center Renovations
ABC - Office Build-Out
Levitt Center for University Advancement
Corporate Headquarters
Corporate Headquarters Renovation
Goodnow Hall Restoration & Renovation
Hub Tower Conference Center
Corporate Highrise
Reid “E” Research Facility
© 2022 BBS Architects | engineers, All rights reserved.